A new build does not give you a date. It gives you notice.
That single difference is why new-build moves go wrong more often than chain
purchases, and it has nothing to do with the house. It is a scheduling problem, and
it is entirely manageable once it is understood.
-
01
Notice, not a date
A developer gives notice to complete once the house is signed off, and the window between that notice and the day itself is short. Booking a removal against an anticipated date rarely survives contact with the build programme, so we hold a provisional slot and firm it up when the notice lands.
-
02
The road may still be a site road
On a part-built estate the surface outside your plot is frequently unadopted, unfinished, or shared with construction traffic that has right of way. We check what a large vehicle can actually reach rather than assuming the plan drawing is the current state of the ground.
-
03
Nothing is marked out yet
No residents bays, no visitor spaces, sometimes no kerbs. That sounds like freedom and is usually the opposite, because the site manager decides what may stand where and for how long. We ask who that is before the day.
-
04
Everything arrives at once
New houses come with nothing. On the day the removal happens there are frequently also white goods being delivered, flooring going down, and a handover inspection. Sequencing those is worth ten minutes of planning and costs a whole morning when it is left to chance.